No remorse or apology for what was a monumental stuff up. A smaller pit, waste rock emplacement and tailings dam? Where did that come from? Same EIS that community groups are all over? Same consultation strategy of sport sponsorship and buying drinks at the rugby? Continued policy of refusing to talk to local landholders? Expecting multiple property owners to grant power line access. Promising "even less" impact than the none they have been claiming....This is pitiful.
- Forums
- ASX - By Stock
- Ann: Bowdens Silver Project Update
No remorse or apology for what was a monumental stuff up. A...
-
- There are more pages in this discussion • 180 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add SVL (ASX) to my watchlist
(20min delay)
|
|||||
Last
9.3¢ |
Change
-0.002(1.60%) |
Mkt cap ! $141.7M |
Open | High | Low | Value | Volume |
9.4¢ | 9.5¢ | 9.2¢ | $302.6K | 3.234M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
12 | 926879 | 9.2¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
9.3¢ | 331000 | 9 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
11 | 872532 | 0.092 |
14 | 1111171 | 0.091 |
38 | 1701214 | 0.090 |
13 | 478571 | 0.089 |
16 | 515531 | 0.088 |
Price($) | Vol. | No. |
---|---|---|
0.093 | 331000 | 9 |
0.094 | 788671 | 6 |
0.095 | 894016 | 9 |
0.096 | 942045 | 8 |
0.097 | 660728 | 6 |
Last trade - 10.42am 30/09/2024 (20 minute delay) ? |
Featured News
SVL (ASX) Chart |