The numbers don't gel at all...Below is from Annual Report released 16/10/20:
"Musgrave has an estimated 613koz of gold in resources on the Cue Project and completed more than 50,000m of drilling during the year. The total
Indicated and Inferred JORC Mineral Resources on the project are: 6.45Mt @ 3.0g/t Au for 613,000 ounces of gold (see ASX announcements 14 July 2017, and 17 February 2020). The new Starlight and White Light discoveries are not included in this resource estimate.
Announcement today:
"The Mineral Resource (Indicated and Inferred) update at Break of Day has estimated the Starlight and White Light lodes to host:
360kt @ 13.9g/t gold for 161,000 ounces of contained gold.
"The updated total Indicated and Inferred Mineral Resources for the Cue Project, incorporating the Break of Day and Lena deposits and several smaller deposits, now stands at 6.4Mt @ 3.2g/t Au for 659,000oz of contained gold."
So 613,000oz + 161,000oz = 774,000oz
How do they come up with 659,000oz
Where is the missing 115,000ozs?
- Forums
- ASX - By Stock
- Ann: Break of Day High-Grade Mineral Resource Estimate - Amended
The numbers don't gel at all...Below is from Annual Report...
-
- There are more pages in this discussion • 52 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add MGV (ASX) to my watchlist
Currently unlisted public company.
The Watchlist
EQN
EQUINOX RESOURCES LIMITED.
Zac Komur, MD & CEO
Zac Komur
MD & CEO
SPONSORED BY The Market Online