MGV 0.00% 39.0¢ musgrave minerals limited

The numbers don't gel at all...Below is from Annual Report...

ANNOUNCEMENT SPONSORED BY PLUS500
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM
CFD Service. Your Capital is at risk
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
  1. 265 Posts.
    lightbulb Created with Sketch. 84
    The numbers don't gel at all...
    Below is from Annual Report released 16/10/20:
    "Musgrave has an estimated 613koz of gold in resources on the Cue Project and completed more than 50,000m of drilling during the year. The total
    Indicated and Inferred JORC Mineral Resources on the project are: 6.45Mt @ 3.0g/t Au for 613,000 ounces of gold (see ASX announcements 14 July 2017, and 17 February 2020). The new Starlight and White Light discoveries are not included in this resource estimate.

    Announcement today:
    "The Mineral Resource (Indicated and Inferred) update at Break of Day has estimated the Starlight and White Light lodes to host:
    360kt @ 13.9g/t gold for 161,000 ounces of contained gold.

    "The updated total Indicated and Inferred Mineral Resources for the Cue Project, incorporating the Break of Day and Lena deposits and several smaller deposits, now stands at 6.4Mt @ 3.2g/t Au for 659,000oz of contained gold."

    So 613,000oz + 161,000oz = 774,000oz
    How do they come up with 659,000oz
    Where is the missing 115,000ozs?
 
watchlist Created with Sketch. Add MGV (ASX) to my watchlist

Currently unlisted public company.

arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.