MTM mtm critical metals limited

What a dreadful website - pictures were there until i hit...

  1. 3,226 Posts.
    lightbulb Created with Sketch. 722
    What a dreadful website - pictures were there until i hit submit

    Zac, I think the timelines are ambiguous. Hopefully the company can clarify for us the following:

    ASX Release: 29 January 2025 referred to “process and mechanical design criteria for the Demonstration Plant is on target for completion by the end of February 2025”. Quote from the full text of the announcement, and summarised in the headlines as.

    https://hotcopper.com.au/data/attachments/6817/6817911-692de3d36062cc9710adcb5c4f5a2905.jpg

    However, in ASX release 31 January 2025 it refers to“progressing the design and engineering of its 1-tonne-per-day FJH demonstration plant in Texas, with design completion scheduled for Q1-2025”(i.e. end March)

    https://hotcopper.com.au/data/attachments/6817/6817914-2cf7ddf6233c9df0b41b5118a3e78276.jpg

    These two announcements 2 days apart refer to quite different milestones.

    One being design criteria (intangible - standards or specifications that engineering projects must meet for success, including functionality, safety, cost, and durability), the other beingdesign and engineering (a tangible product).
    Last edited by Coit: 18/02/25
 
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
(20min delay)
Last
60.5¢
Change
-0.040(6.20%)
Mkt cap ! $279.4M
Open High Low Value Volume
62.5¢ 63.5¢ 59.8¢ $2.514M 4.104M

Buyers (Bids)

No. Vol. Price($)
3 17124 60.5¢
 

Sellers (Offers)

Price($) Vol. No.
62.0¢ 200000 1
View Market Depth
Last trade - 16.10pm 20/06/2025 (20 minute delay) ?
MTM (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.