RDM 0.00% 16.5¢ red metal limited

Ann: BREAKTHROUGH REO LEACH TESTS ON SYBELLA, page-261

  1. 259 Posts.
    lightbulb Created with Sketch. 922
    It is my understanding that any preliminary economic models cannot be released to the market - they are used by the board to decide if they want to advance the project. The ASX is extremely strict with releasing economics, the minimum a company can release is a full scoping study. To get to a scoping study they need an MRE with enough tonnes for scoping study in indicated (approx. a 50:50 indicated to inferred ratio is typically accepted by the ASX). So they will need to get cracking with drilling to get there, but given the grade consistency and the way resource modelling works (geostatistics) they can probably get to indicated with wide spaced drill holes so it isn't a huge undertaking.

    I would be very interested to see a timeline for Phase 2 met work, Phase 2 drilling, scoping study.
 
watchlist Created with Sketch. Add RDM (ASX) to my watchlist
(20min delay)
Last
16.5¢
Change
0.000(0.00%)
Mkt cap ! $49.41M
Open High Low Value Volume
16.5¢ 16.5¢ 16.5¢ $12.52K 75.90K

Buyers (Bids)

No. Vol. Price($)
1 4864 16.5¢
 

Sellers (Offers)

Price($) Vol. No.
17.0¢ 191914 4
View Market Depth
Last trade - 12.12pm 29/05/2024 (20 minute delay) ?
Last
17.0¢
  Change
0.000 ( 3.03 %)
Open High Low Volume
17.0¢ 17.0¢ 17.0¢ 6250
Last updated 12.52pm 29/05/2024 ?
RDM (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.