It is my understanding that any preliminary economic models cannot be released to the market - they are used by the board to decide if they want to advance the project. The ASX is extremely strict with releasing economics, the minimum a company can release is a full scoping study. To get to a scoping study they need an MRE with enough tonnes for scoping study in indicated (approx. a 50:50 indicated to inferred ratio is typically accepted by the ASX). So they will need to get cracking with drilling to get there, but given the grade consistency and the way resource modelling works (geostatistics) they can probably get to indicated with wide spaced drill holes so it isn't a huge undertaking.
I would be very interested to see a timeline for Phase 2 met work, Phase 2 drilling, scoping study.
- Forums
- ASX - By Stock
- Ann: BREAKTHROUGH REO LEACH TESTS ON SYBELLA
It is my understanding that any preliminary economic models...
-
- There are more pages in this discussion • 7 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add RDM (ASX) to my watchlist
(20min delay)
|
|||||
Last
16.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $47.89M |
Open | High | Low | Value | Volume |
16.0¢ | 16.0¢ | 16.0¢ | $1.141K | 7.129K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 23237 | 15.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
16.0¢ | 195945 | 6 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 23237 | 0.155 |
6 | 144339 | 0.150 |
4 | 114827 | 0.145 |
6 | 477173 | 0.140 |
3 | 233730 | 0.135 |
Price($) | Vol. | No. |
---|---|---|
0.160 | 195945 | 6 |
0.165 | 202378 | 5 |
0.170 | 82493 | 4 |
0.175 | 89982 | 3 |
0.180 | 211855 | 5 |
Last trade - 10.06am 15/05/2024 (20 minute delay) ? |
Featured News
RDM (ASX) Chart |