CPM 1.49% 6.8¢ cooper metals limited

Ann: Brumby Ridge Fault enhances prospectivity of Mt Isa Project, page-3

  1. 964 Posts.
    lightbulb Created with Sketch. 43
    Good if someone smarter than me can state if these are ok haha
 
watchlist Created with Sketch. Add CPM (ASX) to my watchlist
(20min delay)
Last
6.8¢
Change
0.001(1.49%)
Mkt cap ! $5.328M
Open High Low Value Volume
6.8¢ 6.8¢ 6.8¢ $544 8K

Buyers (Bids)

No. Vol. Price($)
1 152807 6.3¢
 

Sellers (Offers)

Price($) Vol. No.
6.8¢ 24749 2
View Market Depth
Last trade - 10.30am 12/09/2024 (20 minute delay) ?
CPM (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.