Ok. Thanks.
The question in my mind is whether the new AISC for LOM will ever come down if the stage 1 gets bigger and it is unclear if stage 1 will get bigger.
Was the 164Ktpa LOM plan (and those operating costs) ever a realistic option?
I have some concerns about the number of bores and trench they are adding compared to the relatively small increase in output. Is the resource now underperforming? Or does the increase in bores/trench represent excess capacity awaiting even more ponds?
- Forums
- ASX - By Stock
- KLL
- Ann: BSOPP Feasibility Study Complete - New 120ktpa Base Case
Ann: BSOPP Feasibility Study Complete - New 120ktpa Base Case, page-168
-
- There are more pages in this discussion • 181 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
GML
Gateway Mining sells WA Eastern Montague gold project to Brightstar for $14M – half of that in shares
MND
Albemarle lithium downsize burns $200M hole in Monadelphous's pocket as latter's contracts terminated
Add KLL (ASX) to my watchlist
|
|||||
Last
$7.28 |
Change
0.000(0.00%) |
Mkt cap ! $2.499M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
KLL (ASX) Chart |
Day chart unavailable