Thanks. Good point re back up bores. I hadn’t noted those.
Agree with what you suggest about proportion. When considered with the pond sizing the project would appear to be performing as estimated or better which is good to see.
The cost and timing is a separate issue.
- Forums
- ASX - By Stock
- KLL
- Ann: BSOPP Feasibility Study Complete - New 120ktpa Base Case
Ann: BSOPP Feasibility Study Complete - New 120ktpa Base Case, page-223
-
- There are more pages in this discussion • 126 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add KLL (ASX) to my watchlist
(20min delay)
|
|||||
Last
$7.28 |
Change
0.000(0.00%) |
Mkt cap ! $2.499M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Featured News
KLL (ASX) Chart |
Day chart unavailable
The Watchlist
LPM
LITHIUM PLUS MINERALS LTD.
Simon Kidston, Non--Executive Director
Simon Kidston
Non--Executive Director
SPONSORED BY The Market Online