Isn't heap leach about a third or the operating cost and a third of the capital cost of cyanide and here is getting 2/3rds of the recovery. I need to math that. Density the same for oxide and transitional material. How do you get oxide with a lower recovery than transitional? I have never seen that before. Oxide should be powder or clay. Transitional should be rock. Even with the difference in grind size it doesn't make sense. This gives more questions than it answers.
- Forums
- ASX - By Stock
- PRX
- Ann: Buccaneer Gold Project - Metallurgical Update
Ann: Buccaneer Gold Project - Metallurgical Update, page-2
-
- There are more pages in this discussion • 1 more message in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add PRX (ASX) to my watchlist
|
|||||
Last
0.3¢ |
Change
0.000(0.00%) |
Mkt cap ! $6.353M |
Open | High | Low | Value | Volume |
0.2¢ | 0.3¢ | 0.2¢ | $44.17K | 21.57M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
20 | 23551203 | 0.2¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
0.3¢ | 19168695 | 22 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
19 | 23451203 | 0.002 |
24 | 93502098 | 0.001 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
0 | 0 | 0.000 |
Price($) | Vol. | No. |
---|---|---|
0.003 | 19168695 | 22 |
0.004 | 13035163 | 17 |
0.005 | 3438264 | 8 |
0.006 | 2860001 | 6 |
0.007 | 600000 | 2 |
Last trade - 16.10pm 24/06/2024 (20 minute delay) ? |
Featured News
PRX (ASX) Chart |