1st stage tooling would have already been completed an expensed. There will always be additional costs associated with tweaking the product moving forward, especially for mass production, however in the short term it is fair to assume most of the production 'setup costs' have been incurred already.
- Forums
- ASX - By Stock
- Ann: Buddy Ohm introduced to US Market & at IOT World 2017
1st stage tooling would have already been completed an expensed....
-
-
- There are more pages in this discussion • 3 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)