From the ann a while back on the ES or FS , WHO THE f* KNOWS THOUGH
The Project will need to undergo a thorough Prefeasibility Study, Feasibility Study, with permitting,
and
approvals, and engineering design required before construction and commissioning can proceed. It is
estimated by the Company that this can be done in 24 to 48 months.
- Forums
- ASX - By Stock
- MGU
- Ann: Buena Vista Project Update
Ann: Buena Vista Project Update, page-9
-
-
- There are more pages in this discussion • 122 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
TG1
TechGen Metals kicks off airborne geophys survey at Sally Downs copper play – a first for the permit
MND
Albemarle lithium downsize burns $200M hole in Monadelphous's pocket as latter's contracts terminated
Add MGU (ASX) to my watchlist
|
|||||
Last
1.4¢ |
Change
0.001(7.69%) |
Mkt cap ! $11.33M |
Open | High | Low | Value | Volume |
1.3¢ | 1.4¢ | 1.3¢ | $17.66K | 1.291M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
16 | 1955042 | 1.3¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.4¢ | 191985 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
14 | 1839042 | 0.013 |
12 | 1079333 | 0.012 |
5 | 1430500 | 0.011 |
3 | 1400000 | 0.010 |
3 | 490000 | 0.008 |
Price($) | Vol. | No. |
---|---|---|
0.014 | 191985 | 1 |
0.015 | 1 | 1 |
0.016 | 864565 | 4 |
0.017 | 409745 | 4 |
0.018 | 123060 | 2 |
Last trade - 11.33am 02/08/2024 (20 minute delay) ? |
Featured News
MGU (ASX) Chart |