It is scheduled as a 30 day well, no flwtest, just plenty of MDT fluid & pressure sampling, with WL logs. Should b wrapped up early Dec as its a shallow well.
Planned TD is 3310m MD, Elang top is apprx 3250m.
Basically drill the top hole, set conductor. Then drill the intermediate section to apprx 2700m & set the 9" csg, pressure test BOP & drill to TD & then run WL logs. Hence the USD20mil tag. Results etc will require 2 future step-out wells to go to production as there's no EWT's in this part of the world. Plenty of time to go.
- Forums
- ASX - By Stock
- Ann: Buffalo-10 Drilling Update
It is scheduled as a 30 day well, no flwtest, just plenty of MDT...
-
- There are more pages in this discussion • 14 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CVN (ASX) to my watchlist
(20min delay)
|
|||||
Last
15.8¢ |
Change
0.003(1.61%) |
Mkt cap ! $277.3M |
Open | High | Low | Value | Volume |
15.5¢ | 15.8¢ | 15.5¢ | $16.55K | 105.3K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
19 | 1029849 | 15.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
16.0¢ | 627701 | 22 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
19 | 1029849 | 0.155 |
24 | 1455321 | 0.150 |
23 | 1055102 | 0.145 |
14 | 788333 | 0.140 |
6 | 631002 | 0.135 |
Price($) | Vol. | No. |
---|---|---|
0.160 | 627701 | 22 |
0.165 | 1862906 | 14 |
0.170 | 784287 | 15 |
0.175 | 975006 | 10 |
0.180 | 597382 | 9 |
Last trade - 12.20pm 01/11/2024 (20 minute delay) ? |
Featured News
CVN (ASX) Chart |