The whole premise of this well was that the seismic reprocessing showed there was significant updip reservoir that had not been drained by the previous production .
Hitting the top of the reservoir 80m low means that the geological model produced by the reprocessing was wrong .
The oil left in the structure is a lot less than they hoped for .
Best result is a marginally profitable project but more likely there is not enough oil left there to justify development .
I would like to be wrong of course but the implications of losing 80 m of structural closure are fairly clear let alone the small amount of net reservoir .
One down two to go .
Quite a kick to lose the relatively short term revenue this project would have given but disappointments are just part of this business .
Two big exploration wells to come fingers crossed .
- Forums
- ASX - By Stock
- CVN
- Ann: Buffalo-10 Drilling Update
Ann: Buffalo-10 Drilling Update, page-56
-
- There are more pages in this discussion • 98 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CVN (ASX) to my watchlist
|
|||||
Last
20.0¢ |
Change
-0.005(2.44%) |
Mkt cap ! $357.7M |
Open | High | Low | Value | Volume |
20.5¢ | 20.5¢ | 20.0¢ | $150.0K | 733.5K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
12 | 1468915 | 20.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
20.5¢ | 665924 | 14 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
12 | 1468907 | 0.200 |
14 | 507939 | 0.195 |
18 | 739700 | 0.190 |
25 | 2961895 | 0.185 |
12 | 1016287 | 0.180 |
Price($) | Vol. | No. |
---|---|---|
0.205 | 665924 | 14 |
0.210 | 702187 | 17 |
0.215 | 635699 | 13 |
0.220 | 763210 | 18 |
0.225 | 348806 | 10 |
Last trade - 10.59am 24/06/2024 (20 minute delay) ? |
Featured News
CVN (ASX) Chart |
The Watchlist
FHE
FRONTIER ENERGY LIMITED
Adam Kiley, CEO
Adam Kiley
CEO
SPONSORED BY The Market Online