The whole premise of this well was that the seismic reprocessing showed there was significant updip reservoir that had not been drained by the previous production .
Hitting the top of the reservoir 80m low means that the geological model produced by the reprocessing was wrong .
The oil left in the structure is a lot less than they hoped for .
Best result is a marginally profitable project but more likely there is not enough oil left there to justify development .
I would like to be wrong of course but the implications of losing 80 m of structural closure are fairly clear let alone the small amount of net reservoir .
One down two to go .
Quite a kick to lose the relatively short term revenue this project would have given but disappointments are just part of this business .
Two big exploration wells to come fingers crossed .
- Forums
- ASX - By Stock
- Ann: Buffalo-10 Drilling Update
The whole premise of this well was that the seismic reprocessing...
-
- There are more pages in this discussion • 98 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CVN (ASX) to my watchlist
|
|||||
Last
16.0¢ |
Change
-0.005(3.03%) |
Mkt cap ! $286.2M |
Open | High | Low | Value | Volume |
16.5¢ | 16.8¢ | 15.8¢ | $1.111M | 6.869M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
12 | 2236897 | 15.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
16.5¢ | 1554760 | 6 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
11 | 2219920 | 0.155 |
16 | 1089094 | 0.150 |
6 | 491088 | 0.145 |
3 | 395100 | 0.140 |
3 | 57001 | 0.135 |
Price($) | Vol. | No. |
---|---|---|
0.165 | 1554760 | 6 |
0.170 | 410087 | 9 |
0.175 | 536889 | 9 |
0.180 | 1366600 | 12 |
0.185 | 2081021 | 14 |
Last trade - 16.10pm 22/07/2024 (20 minute delay) ? |
Featured News
CVN (ASX) Chart |