CVN 2.94% 16.5¢ carnarvon energy limited

Ann: Buffalo Drilling Update, page-30

  1. 877 Posts.
    lightbulb Created with Sketch. 345
    There are long lead well items in the drilling process too. Remember, B10 was always going to be designed as a production well, hence the 'detailed well design'. As for the shore base, this is always required for a drilling operation. You need a contracted shore base to mobilise from, store the drill strings, mix and load out mud, do bunkering etc. etc. I wouldn't read too much into this.
 
watchlist Created with Sketch. Add CVN (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.