PSI81 : Well expressed : I am optimistic, but also acutely aware of the things that might go wrong.... but I do not think gas cap is at all likely as the oil produced at Buffalo is very undersaturated in dissolved gas, suggesting that it does not have a gas cap. The original Buffalo development used gas-lift to lift the oil and produced water to surface, and the low gas availability (combined with increasing water% that needed to be lifted) was a contributing reason why that development was terminated whilst it was still capable of 4000 BOPD. This issue will be overcome in any new development by using electric submersible pumps (ESPs) to lift the oil and produced water.
- Forums
- ASX - By Stock
- Ann: Buffalo Project Update
PSI81 : Well expressed : I am optimistic, but also acutely aware...
-
- There are more pages in this discussion • 296 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CVN (ASX) to my watchlist
(20min delay)
|
|||||
Last
18.5¢ |
Change
-0.005(2.63%) |
Mkt cap ! $330.6M |
Open | High | Low | Value | Volume |
18.5¢ | 19.0¢ | 18.5¢ | $683.0K | 3.642M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
24 | 1534815 | 18.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
19.0¢ | 338152 | 6 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
19 | 1134815 | 0.185 |
16 | 1508639 | 0.180 |
7 | 757857 | 0.175 |
2 | 260000 | 0.170 |
2 | 277700 | 0.165 |
Price($) | Vol. | No. |
---|---|---|
0.190 | 54750 | 2 |
0.195 | 2503610 | 13 |
0.200 | 1228450 | 24 |
0.205 | 1164397 | 16 |
0.210 | 1270000 | 12 |
Last trade - 16.10pm 03/05/2024 (20 minute delay) ? |
|
|||||
Last
18.8¢ |
  |
Change
-0.005 ( 0.05 %) |
|||
Open | High | Low | Volume | ||
18.8¢ | 19.0¢ | 18.5¢ | 2404632 | ||
Last updated 15.59pm 03/05/2024 ? |
Featured News
CVN (ASX) Chart |