CVN 0.00% 19.5¢ carnarvon energy limited

Ann: Buffalo Project Update, page-253

  1. Ya
    6,809 Posts.
    lightbulb Created with Sketch. 3829
    The rig is still at Skua with Jadestone, since arriving onsite on the 19th Sept. It was supposed to b 2 well workover operation, as these 2 have been offline since 2H-2020.

    Skua-11 had issues with its gas lift gear, not sure about the Skua 10-ST2 well. The wells were batch drilled back in 2008 by the West Atlas rig when Coogee were the Operator. Production shortfall from these 2 wells was compensated by oil produced from the nearby Swift/Swallow well.

    It is frustrating but not much one can do till they release the rig to B-10 location.

    Link to the last update on SEDAR by Jadestone.

    https://www.sedar.com/GetFile.do?lang=EN&docClass=8&issuerNo=00052177&issuerType=03&projectNo=03282820&docId=5050160
 
watchlist Created with Sketch. Add CVN (ASX) to my watchlist
(20min delay)
Last
19.5¢
Change
0.000(0.00%)
Mkt cap ! $348.8M
Open High Low Value Volume
20.0¢ 20.0¢ 19.0¢ $772.5K 3.980M

Buyers (Bids)

No. Vol. Price($)
26 1869757 19.0¢
 

Sellers (Offers)

Price($) Vol. No.
19.5¢ 305515 24
View Market Depth
Last trade - 15.55pm 16/07/2024 (20 minute delay) ?
CVN (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.