CVN 9.68% 17.0¢ carnarvon energy limited

The rig is still at Skua with Jadestone, since arriving onsite...

  1. Ya
    6,809 Posts.
    lightbulb Created with Sketch. 3829
    The rig is still at Skua with Jadestone, since arriving onsite on the 19th Sept. It was supposed to b 2 well workover operation, as these 2 have been offline since 2H-2020.

    Skua-11 had issues with its gas lift gear, not sure about the Skua 10-ST2 well. The wells were batch drilled back in 2008 by the West Atlas rig when Coogee were the Operator. Production shortfall from these 2 wells was compensated by oil produced from the nearby Swift/Swallow well.

    It is frustrating but not much one can do till they release the rig to B-10 location.

    Link to the last update on SEDAR by Jadestone.

    https://www.sedar.com/GetFile.do?lang=EN&docClass=8&issuerNo=00052177&issuerType=03&projectNo=03282820&docId=5050160
 
watchlist Created with Sketch. Add CVN (ASX) to my watchlist
(20min delay)
Last
17.0¢
Change
0.015(9.68%)
Mkt cap ! $304.1M
Open High Low Value Volume
15.0¢ 17.0¢ 15.0¢ $675.5K 4.272M

Buyers (Bids)

No. Vol. Price($)
2 59750 16.0¢
 

Sellers (Offers)

Price($) Vol. No.
17.0¢ 1916292 14
View Market Depth
Last trade - 16.10pm 14/08/2024 (20 minute delay) ?
CVN (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.