The rig is still at Skua with Jadestone, since arriving onsite on the 19th Sept. It was supposed to b 2 well workover operation, as these 2 have been offline since 2H-2020.
Skua-11 had issues with its gas lift gear, not sure about the Skua 10-ST2 well. The wells were batch drilled back in 2008 by the West Atlas rig when Coogee were the Operator. Production shortfall from these 2 wells was compensated by oil produced from the nearby Swift/Swallow well.
It is frustrating but not much one can do till they release the rig to B-10 location.
Link to the last update on SEDAR by Jadestone.
https://www.sedar.com/GetFile.do?lang=EN&docClass=8&issuerNo=00052177&issuerType=03&projectNo=03282820&docId=5050160
- Forums
- ASX - By Stock
- CVN
- Ann: Buffalo Project Update
Ann: Buffalo Project Update, page-253
- There are more pages in this discussion • 54 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add CVN (ASX) to my watchlist
(20min delay)
|
|||||
Last
20.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $357.7M |
Open | High | Low | Value | Volume |
20.5¢ | 20.5¢ | 20.0¢ | $154.0K | 760.4K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
22 | 1729460 | 20.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
20.5¢ | 343429 | 9 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
21 | 1699460 | 0.200 |
13 | 825656 | 0.195 |
11 | 546668 | 0.190 |
8 | 1226700 | 0.185 |
12 | 566611 | 0.180 |
Price($) | Vol. | No. |
---|---|---|
0.205 | 343429 | 9 |
0.210 | 1009679 | 11 |
0.215 | 127041 | 5 |
0.220 | 815799 | 13 |
0.225 | 598229 | 11 |
Last trade - 16.10pm 06/06/2024 (20 minute delay) ? |
|
|||||
Last
20.0¢ |
  |
Change
0.000 ( 1.23 %) |
|||
Open | High | Low | Volume | ||
20.3¢ | 20.5¢ | 20.0¢ | 452439 | ||
Last updated 15.59pm 06/06/2024 ? |
Featured News
CVN (ASX) Chart |