SVL 1.08% 9.4¢ silver mines limited

Ann: Bundarra Zone Expansion at the Bowdens Silver Project, page-15

  1. 3,463 Posts.
    lightbulb Created with Sketch. 355
    Then I have to add 18 months on my waiting list until construction finishes... then another year to ramp up and start full production. Okay I will check back in 2.5 years time. Thanks
 
watchlist Created with Sketch. Add SVL (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.