Main points:barrels of oil per day (1128 bopd).
- Bunian 5 commenced production on test from the TRM 3 sandstone, recording over 1100
or slightly higher levels than at Bunian 3 ST2, the best producing well in the field.
- The TRM 3 reservoir is one of two high quality oil zones intersected in this well.
- Bunian 5 intersected the two primary reservoirs, the TRM3 and K sandstones at the same
Bunian field.
- This result confirms that Bunian-5 is expected to double overall production from the
commence a similar test on the K sandstone reservoir.
- Next steps – perform production test on the TRM 3 reservoir over seven days and then
Tangai Sukananti.
- Oil produced from the test will be trucked and sold along with all other crude produced at
- Forums
- ASX - By Stock
- Ann: Bunian-5 Oil Production Commences Strongly
Main points:Bunian 5 commenced production on test from the TRM 3...
-
- There are more pages in this discussion • 81 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add BAS (ASX) to my watchlist
(20min delay)
|
|||||
Last
7.0¢ |
Change
-0.007(9.09%) |
Mkt cap ! $20.33M |
Open | High | Low | Value | Volume |
7.0¢ | 7.0¢ | 7.0¢ | $3.5K | 50K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 58600 | 7.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
7.3¢ | 23342 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 58600 | 0.070 |
1 | 10000 | 0.068 |
1 | 10000 | 0.064 |
1 | 5500 | 0.063 |
1 | 78000 | 0.062 |
Price($) | Vol. | No. |
---|---|---|
0.074 | 74999 | 1 |
0.075 | 6933 | 1 |
0.077 | 14925 | 1 |
0.078 | 34568 | 3 |
0.079 | 72000 | 1 |
Last trade - 10.21am 09/08/2024 (20 minute delay) ? |
Featured News
BAS (ASX) Chart |