I would assume they are spending more time setting the concrete than usual due to the high pressure from the gas?
Disclaimer: I am no engineer.
For example, this chart shows that with a specific additive, and at around 60-70°C the concrete will still take >24 hours to reach 25Mpa.
And in the below table, shows combinations of MPa, curing temperature, pressure, and time.
I wonder how much pressure they need to withstand, and if it's from all the gas?
Note: "The results are difficult to compare owing to the variety of different mix designs curing conditions, curing time before testing and sample sizes"
Source: https://www.petroleum.sa.gov.au/__data/assets/pdf_file/0008/272492/20161014_-_UoA_-_Well_Cement_Integrity_and_Cementing_Practices.pdf
- Forums
- ASX - By Stock
- Ann: Buru spuds Rafael 1 - High upside oil exploration well
I would assume they are spending more time setting the concrete...
-
- There are more pages in this discussion • 14 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add BRU (ASX) to my watchlist
|
|||||
Last
8.9¢ |
Change
0.008(9.88%) |
Mkt cap ! $59.75M |
Open | High | Low | Value | Volume |
7.8¢ | 8.9¢ | 7.7¢ | $237.1K | 3.002M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 74730 | 8.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
8.9¢ | 12236 | 2 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 74730 | 0.080 |
1 | 250000 | 0.079 |
1 | 40562 | 0.078 |
3 | 276897 | 0.077 |
1 | 100000 | 0.076 |
Price($) | Vol. | No. |
---|---|---|
0.089 | 12236 | 2 |
0.090 | 465966 | 1 |
0.091 | 50000 | 1 |
0.094 | 109969 | 3 |
0.100 | 403603 | 3 |
Last trade - 16.10pm 28/06/2024 (20 minute delay) ? |
Featured News
BRU (ASX) Chart |
The Watchlist
LU7
LITHIUM UNIVERSE LIMITED
Alex Hanly, CEO
Alex Hanly
CEO
SPONSORED BY The Market Online