BRU 9.88% 8.9¢ buru energy limited

I would assume they are spending more time setting the concrete...

  1. 142 Posts.
    lightbulb Created with Sketch. 43
    I would assume they are spending more time setting the concrete than usual due to the high pressure from the gas?
    Disclaimer: I am no engineer.

    For example, this chart shows that with a specific additive, and at around 60-70°C the concrete will still take >24 hours to reach 25Mpa.

    https://hotcopper.com.au/data/attachments/3800/3800211-c8513f0060acb22b5f643e724ccd135e.jpg

    And in the below table, shows combinations of MPa, curing temperature, pressure, and time.
    I wonder how much pressure they need to withstand, and if it's from all the gas?

    Note: "The results are difficult to compare owing to the variety of different mix designs curing conditions, curing time before testing and sample sizes"

    https://hotcopper.com.au/data/attachments/3800/3800276-daae0b957631ac32e95536622907325f.jpg
    https://hotcopper.com.au/data/attachments/3800/3800246-5fee31bfcf8e81e5295d050c8b4c7d57.jpg

    Source: https://www.petroleum.sa.gov.au/__data/assets/pdf_file/0008/272492/20161014_-_UoA_-_Well_Cement_Integrity_and_Cementing_Practices.pdf

 
watchlist Created with Sketch. Add BRU (ASX) to my watchlist
(20min delay)
Last
8.9¢
Change
0.008(9.88%)
Mkt cap ! $59.75M
Open High Low Value Volume
7.8¢ 8.9¢ 7.7¢ $237.1K 3.002M

Buyers (Bids)

No. Vol. Price($)
1 74730 8.0¢
 

Sellers (Offers)

Price($) Vol. No.
8.9¢ 12236 2
View Market Depth
Last trade - 16.10pm 28/06/2024 (20 minute delay) ?
BRU (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.