E25 0.00% 20.5¢ element 25 limited

Ann: Butcherbird Manganese Project Operational Update, page-42

  1. 2,749 Posts.
    lightbulb Created with Sketch. 5973
    Below are a selection of comments from 29 October onwards. Even back at 29 October the plan was around rolling out a change before the end of the year, with the implication that this change would allow name plate production from the start of calendar year 2022. Run it for a few months and confirm everything works as intended then make decisions around stage 2.

    In the September Quarterly of 29 October we had:
    https://hotcopper.com.au/data/attachments/3825/3825689-88039f78d76cc7a5fb58245c1ce1497e.jpg
    and
    https://hotcopper.com.au/data/attachments/3825/3825690-c8c53b253433867f356b0bbc57c2b832.jpg
    The shipping update of 4 November used slightly different words
    https://hotcopper.com.au/data/attachments/3825/3825697-b4a039490ca40c5635d97783d4623a14.jpg
    Basically the same statement appeared in the 22 November update.
    https://hotcopper.com.au/data/attachments/3825/3825704-f0c157d46a19cf4de7d7318e69a31c2b.jpg
    https://hotcopper.com.au/data/attachments/3825/3825701-8004482a321168ae7eeb8d5883b9a81d.jpg
 
watchlist Created with Sketch. Add E25 (ASX) to my watchlist
(20min delay)
Last
20.5¢
Change
0.000(0.00%)
Mkt cap ! $45.08M
Open High Low Value Volume
21.0¢ 21.0¢ 20.5¢ $3.847K 18.65K

Buyers (Bids)

No. Vol. Price($)
5 47676 20.5¢
 

Sellers (Offers)

Price($) Vol. No.
22.0¢ 152276 3
View Market Depth
Last trade - 14.18pm 05/07/2024 (20 minute delay) ?
E25 (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.