If flow stabilises at 200 bopd then payback for the US 1.1 million cost around 3 months .
BYE said the B55 and the JI sand were small accumulations in the 50 to 100,000 bbl range .
Depletion should be relatively quick , probably only a year or so .
Thought recompletion in the J1 sand was the next after the B55 was depleted , then possible sidetrack after that .
BYE has a couple of SM71 drills on their forward plan , but not for some time .
I would like to see them drill another SM71 well sooner to get the production up to the platform limit .
Both companies could use the increased cash flow .
Might be a squeeze to fit it into the drilling budget but well payback would be quick .
Lets hope the b55 sand stabilises at a higher rate .
gltah
- Forums
- ASX - By Stock
- Ann: BYE: SM71 F2 B55 Sand Recompletion Update
If flow stabilises at 200 bopd then payback for the US 1.1...
-
- There are more pages in this discussion • 3 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add OEL (ASX) to my watchlist
(20min delay)
|
|||||
Last
1.1¢ |
Change
0.000(0.00%) |
Mkt cap ! $52.74M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
2 | 615750 | 1.2¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
1.1¢ | 100000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 615750 | 0.012 |
12 | 12544970 | 0.011 |
8 | 5620909 | 0.010 |
1 | 500000 | 0.009 |
1 | 125124 | 0.008 |
Price($) | Vol. | No. |
---|---|---|
0.011 | 100000 | 1 |
0.012 | 1188401 | 4 |
0.013 | 10925129 | 11 |
0.014 | 6556618 | 7 |
0.015 | 4139109 | 7 |
Last trade - 16.12pm 28/10/2024 (20 minute delay) ? |
Featured News
OEL (ASX) Chart |
Day chart unavailable