AHN 20.0% 0.4¢ athena resources limited

Ann: Byro 5M tpa Plant Prefeasibility Study , page-9

ANNOUNCEMENT SPONSORED BY PLUS500
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM
CFD Service. Your Capital is at risk
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
ANNOUNCEMENT SPONSORED BY PLUS500
CFD TRADING PLATFORM CFD Service. Your Capital is at risk
  1. 37,911 Posts.
    lightbulb Created with Sketch. 828
    definitely no nickel, atm, because drilling was finished months ago...must keep looking

    transportation costs will be high at least $6 per kilometre to truck it, even more (see my ZNC threads)

    98t truck for 500km round journey = $31 per tonne

    at $9 per km = $41 per tonne for trucking

    opex announced today seemed like it was only for processing ["The operating cost of the process plant is $8.46 per tonne milled"]

    so there is still mining costs; waste costs, transport costs, etc
 
watchlist Created with Sketch. Add AHN (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.