They would only need to drill one well at SM58 that had initial production of 2000 bopd and the SP would be over 30 cents .
The residual oil in the lower sands of the G1 well fooled them and the rig failure meant they could not run logs and could not get a definitive measure of what they had .
Based on the quality and amount of reservoir I thought that the G2 well could be a 2000 bopd well and I think they thought that it would be something like that too .
It would have changed everything .
We will see what the SM69 well brings but it is unlikely to be the game changer well they need but even a moderate flow will greatly improve their financial position and might get the next SM58 well drilled that could be the game changer .
- Forums
- ASX - By Stock
- BYE
- Ann: Byron Corporate Update
Ann: Byron Corporate Update, page-78
-
- There are more pages in this discussion • 197 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)