too early for JORC upgrade
they v already done one after the first drilling program
probably realized the poor timing of the 2nd round of zinc drilling at Manindi
now going to follow up with drilling into conductor C4 where last round of drilling produced some very high grade hits
- Forums
- ASX - By Stock
- Ann: C4 Conductor Delivers High Grade Zn Intersection at Manindi
too early for JORC upgrade they v already done one after the...
-
-
- There are more pages in this discussion • 9 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add MLS (ASX) to my watchlist
(20min delay)
|
|||||
Last
2.6¢ |
Change
0.001(4.00%) |
Mkt cap ! $18.90M |
Open | High | Low | Value | Volume |
2.5¢ | 2.6¢ | 2.5¢ | $18.34K | 732.0K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
4 | 1250000 | 2.4¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
2.6¢ | 108482 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
4 | 1250000 | 0.024 |
5 | 408503 | 0.023 |
6 | 656144 | 0.022 |
5 | 828173 | 0.021 |
9 | 1462055 | 0.020 |
Price($) | Vol. | No. |
---|---|---|
0.026 | 108482 | 1 |
0.027 | 255871 | 3 |
0.028 | 425000 | 2 |
0.029 | 877736 | 2 |
0.030 | 299851 | 4 |
Last trade - 15.42pm 13/11/2024 (20 minute delay) ? |
Featured News
MLS (ASX) Chart |