Nice announcement. Happy with 2 ships per month.
trucking approaching 3K tons per day ... wonder if they need to keep stepping that up to hit the 2 ships per month (that's only 45K on each ship if we're at 3K per day and 2 ships per month).
There seemed to be a lot of lump in that last ship which is good.
hopefully that private fleet pulls the trucking up even more and those 2 ships per month go out full to the brim.
MV Yarrawonga looks to be sched for Lupins too ... ha ha .. strange
Iron Ore (55000t)
Lupins (20000t)
As for when it loads, the The vessel departed from LAMMA ISLAND, HK on 2021-05-27 so I would expect it may have to wait a couple of days at anchor before it can load up if the COVID quarantine period of 2wks at sea between ports is still in effect.
- Forums
- ASX - By Stock
- GWR
- Ann: C4 Iron Ore Deposit - Stage 2 and Production Update
Ann: C4 Iron Ore Deposit - Stage 2 and Production Update, page-18
-
- There are more pages in this discussion • 223 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add GWR (ASX) to my watchlist
(20min delay)
|
|||||
Last
8.4¢ |
Change
0.006(7.69%) |
Mkt cap ! $26.98M |
Open | High | Low | Value | Volume |
7.8¢ | 8.4¢ | 7.8¢ | $7.483K | 93.92K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 10000 | 8.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
8.5¢ | 562194 | 4 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 145454 | 0.079 |
2 | 21798 | 0.078 |
1 | 83520 | 0.077 |
2 | 76666 | 0.075 |
1 | 12000 | 0.073 |
Price($) | Vol. | No. |
---|---|---|
0.085 | 562194 | 4 |
0.100 | 91375 | 2 |
0.110 | 5500 | 1 |
0.115 | 15384 | 1 |
0.130 | 50000 | 1 |
Last trade - 16.10pm 27/09/2024 (20 minute delay) ? |
Featured News
GWR (ASX) Chart |