J, my reading of it is that Stage 1 refers to our deal with Pilbara. Getting started, paying off the capex and getting the first million tonnes out. Everything after that is stage 2, no longer obligated to give 30%, no longer obligated to use Pilbara. In this announcement we talk of new contractors as well as renegotiating with Pilbara. 3000 tonnes a day now without the new haulage contractors contributing yet, with them 3 ships a month. Happy days, That’ my reading but I have been known to be wrong.
- Forums
- ASX - By Stock
- GWR
- Ann: C4 Iron Ore Deposit - Stage 2 and Production Update
Ann: C4 Iron Ore Deposit - Stage 2 and Production Update, page-38
-
- There are more pages in this discussion • 203 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add GWR (ASX) to my watchlist
|
|||||
Last
8.2¢ |
Change
0.007(9.33%) |
Mkt cap ! $26.33M |
Open | High | Low | Value | Volume |
8.2¢ | 8.2¢ | 8.2¢ | $10K | 121.9K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 200000 | 7.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
8.2¢ | 222680 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 200000 | 0.075 |
1 | 13888 | 0.072 |
2 | 70000 | 0.071 |
2 | 139285 | 0.070 |
1 | 50000 | 0.060 |
Price($) | Vol. | No. |
---|---|---|
0.082 | 222680 | 1 |
0.085 | 200000 | 1 |
0.090 | 2315 | 1 |
0.095 | 107746 | 1 |
0.100 | 91375 | 2 |
Last trade - 10.04am 13/08/2024 (20 minute delay) ? |
Featured News
GWR (ASX) Chart |
The Watchlist
ACW
ACTINOGEN MEDICAL LIMITED
Steven Gourlay, Managing Director and CEO
Steven Gourlay
Managing Director and CEO
SPONSORED BY The Market Online