MNB 0.00% 5.8¢ minbos resources limited

Ann: Cabinda Fertilizer Plant Construction and Development Update, page-4

  1. 14,225 Posts.
    lightbulb Created with Sketch. 4116
    Yes, that's a big relief to be reading that "The Project’s first production is expected in H1 2024.”
    I think a number of us were starting to wonder if it might have drifted into 2nd half.
 
watchlist Created with Sketch. Add MNB (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.