"Based on the design team changeover I would not consider that first production in H1 2024 is realistic, but happy to be proved wrong."
Don't forget that first production was previously flagged as late 2023 and then early 2024 . The change to H1 2024 was likely to allow for the slow progress and the delays that the company foresaw with the need to change the contractor. So the newer guidance of H1 2024 could already have factored in the delay that you describe in your post.
- Forums
- ASX - By Stock
- MNB
- Ann: Cabinda Fertilizer Plant Construction and Development Update
Ann: Cabinda Fertilizer Plant Construction and Development Update, page-6
-
- There are more pages in this discussion • 26 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add MNB (ASX) to my watchlist
|
|||||
Last
5.4¢ |
Change
0.001(1.89%) |
Mkt cap ! $46.71M |
Open | High | Low | Value | Volume |
5.6¢ | 5.8¢ | 5.4¢ | $35.17K | 629.1K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 491082 | 5.4¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
5.7¢ | 12500 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
2 | 402198 | 0.054 |
4 | 242655 | 0.053 |
2 | 65000 | 0.052 |
1 | 80000 | 0.050 |
1 | 50000 | 0.049 |
Price($) | Vol. | No. |
---|---|---|
0.057 | 12500 | 1 |
0.059 | 47420 | 1 |
0.060 | 316646 | 4 |
0.061 | 89987 | 1 |
0.063 | 50000 | 1 |
Last trade - 13.20pm 28/06/2024 (20 minute delay) ? |
Featured News
MNB (ASX) Chart |
The Watchlist
LU7
LITHIUM UNIVERSE LIMITED
Alex Hanly, CEO
Alex Hanly
CEO
SPONSORED BY The Market Online