MNB 1.41% 7.2¢ minbos resources limited

"Based on the design team changeover I would not consider that...

  1. 14,010 Posts.
    lightbulb Created with Sketch. 4033
    "Based on the design team changeover I would not consider that first production in H1 2024 is realistic, but happy to be proved wrong."
    Don't forget that first production was previously flagged as late 2023 and then early 2024 . The change to H1 2024 was likely to allow for the slow progress and the delays that the company foresaw with the need to change the contractor. So the newer guidance of H1 2024 could already have factored in the delay that you describe in your post.
 
watchlist Created with Sketch. Add MNB (ASX) to my watchlist
(20min delay)
Last
7.2¢
Change
0.001(1.41%)
Mkt cap ! $63.26M
Open High Low Value Volume
7.1¢ 7.2¢ 6.8¢ $35.24K 505.1K

Buyers (Bids)

No. Vol. Price($)
1 20000 6.9¢
 

Sellers (Offers)

Price($) Vol. No.
7.2¢ 108759 2
View Market Depth
Last trade - 16.10pm 16/08/2024 (20 minute delay) ?
MNB (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.