CE1 2.00% 12.8¢ calima energy limited

Ann: Calima Receives Approval For Production Facility, page-7

  1. 10,774 Posts.
    lightbulb Created with Sketch. 3545
    Hey Granty,
    "The Company remains well funded with a working capital position of $5.6m" says the Qtrly

    "sized to accommodate up to 50 Mmcf/d and 1,500 bbls of well head condensate"
    says this announcement

    but prior presentations stated

    "Existing infrastructure 20kmto the north has capability to handle a pilot development plan of up to 50mmcf/d and 2,500bbl/d (10,000 boe/d)."

    and from the Qtrly

    "the Board is resolved to continue with its strategy to put in place the building blocks for a 10,000boe/d development that achieves maximum cost efficiency by making the most of existing infrastructure."

    50Mmcfpd is ~ 8,333 boepd so adding 1,500 Bbls of well head condensate and we at the 10,000 boepd FDP. ( CGR ~33 Bbls/Mmcf).

    Is the market basically also saying that CE1 will only have those 20,000 odd acres as the others will expire? $600/acre and ~$3M NPV10 for each Hz seems like top dollar at present??

    Who would be interested indeed. Still a far cry from the reduced to C$3,000 - C$5,000 per undeveloped acre in most recent preso.


 
watchlist Created with Sketch. Add CE1 (ASX) to my watchlist
(20min delay)
Last
12.8¢
Change
0.003(2.00%)
Mkt cap ! $80.71M
Open High Low Value Volume
12.5¢ 13.0¢ 12.5¢ $783.2K 6.137M

Buyers (Bids)

No. Vol. Price($)
13 17813822 12.5¢
 

Sellers (Offers)

Price($) Vol. No.
13.0¢ 3403929 32
View Market Depth
Last trade - 15.59pm 01/05/2024 (20 minute delay) ?
Last
12.8¢
  Change
0.003 ( 2.00 %)
Open High Low Volume
12.8¢ 13.0¢ 12.5¢ 1624935
Last updated 14.56pm 01/05/2024 ?
CE1 (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.