Just thought I would have a look at where the Leilac 2 is going in..![]()
The site is flat and has good access. It should be fairly straight forward to build and commission. Given that, I would think permitting and build should not take too long and we should have some significant progress news by the next FY report.
The green and yellow appear to be fines collection lines for the calciner. The existing cylinder is the rotary kiln which is the current method of heating the limestone.
- Forums
- ASX - By Stock
- Ann: Calix and Heidelberg Materials confirm new site for Leilac-2
Just thought I would have a look at where the Leilac 2 is going...
Featured News
Add CXL (ASX) to my watchlist
|
|||||
Last
$1.02 |
Change
0.000(0.00%) |
Mkt cap ! $184.3M |
Open | High | Low | Value | Volume |
0.0¢ | 0.0¢ | 0.0¢ | $0 | 0 |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
1 | 2000 | $1.10 |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
$1.01 | 2000 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 2000 | 1.100 |
1 | 14000 | 1.080 |
2 | 16084 | 1.070 |
1 | 105 | 1.065 |
2 | 12470 | 1.060 |
Price($) | Vol. | No. |
---|---|---|
1.010 | 2000 | 1 |
1.020 | 15022 | 1 |
1.050 | 14174 | 3 |
1.070 | 3155 | 1 |
1.080 | 2000 | 1 |
Last trade - 16.16pm 22/07/2024 (20 minute delay) ? |
Featured News
CXL (ASX) Chart |
Day chart unavailable