CXL 0.37% $1.36 calix limited

Highlights • Leilac-2 will be constructed at Heidelberg...

  1. 1,583 Posts.
    lightbulb Created with Sketch. 153
    Highlights • Leilac-2 will be constructed at Heidelberg Materials’ cement plant in Ennigerloh, Germany. • The selection of Ennigerloh as the project’s host plant is the result of a thorough site assessment process that followed Heidelberg Materials’ decision to end clinker production in Hanover, Germany. • The Leilac-2 project has already delivered a robust detailed design ready for construction. This design will now be deployed at Ennigerloh, with minimal delay and additional cost expected. • Construction of Leilac-2 at Ennigerloh using the already prepared design is anticipated to commence promptly following permitting. • The Leilac-2 project aims to demonstrate a scalable solution for the efficient capture of unavoidable carbon dioxide emissions released during cement and lime production whilst operating on a range of fuels. • The successful relocation of Leilac-2 demonstrates the robust and transferrable nature of the Leilac technology and its ability to be rapidly applied at other operational cement plants.
 
watchlist Created with Sketch. Add CXL (ASX) to my watchlist
(20min delay)
Last
$1.36
Change
0.005(0.37%)
Mkt cap ! $248.5M
Open High Low Value Volume
$1.35 $1.39 $1.35 $1.182M 864.5K

Buyers (Bids)

No. Vol. Price($)
2 355 $1.42
 

Sellers (Offers)

Price($) Vol. No.
$1.37 1684 5
View Market Depth
Last trade - 15.59pm 03/05/2024 (20 minute delay) ?
Last
$1.36
  Change
0.005 ( 0.55 %)
Open High Low Volume
$1.37 $1.39 $1.35 133082
Last updated 15.59pm 03/05/2024 ?
CXL (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.