Highlights • Definitive Feasibility Study (DFS) progressing. • Recent requirement for an Environmental Impact Statement (EIS) by the Department of Climate Change, Energy, the Environment and Water (DCCEEW) will impact project approval processes and construction timing. • Discussions continue with the DCCEEW on the draft Guidelines for the EIS • Several different barge designs are being considered for transhipping operations from a purpose-built barge loading facility • Potential offtake partner to visit CFS project in May 2023 • CFS representatives attended the inaugural PV Glass Manufacturing conference in China’s Anhui Province
MLM Price at posting:
3.2¢ Sentiment: Hold Disclosure: Held