CRB 0.00% 0.4¢ carbine resources limited

yes point taken stevenjd , however so far both drilling programs...

  1. 309 Posts.
    lightbulb Created with Sketch. 50
    yes point taken stevenjd , however so far both drilling programs done by different company’s at Muchea has indicated a equal if not better result for sand straight out of the pit compared with the processing end point for QLD .

    this is a striking feature of the sand at Muchea.

    if they are intent on reducing expenses or cap ex perhaps this should be balanced up against a need for plant. A DSO option would expedite production and secure transport if available , whilst refining processes are being addressed.
    there are some critical steps here to achieve if this is to go ahead a loss leading start to achieve these critical steps should be considered I believe
 
watchlist Created with Sketch. Add CRB (ASX) to my watchlist
(20min delay)
Last
0.4¢
Change
0.000(0.00%)
Mkt cap ! $2.207M
Open High Low Value Volume
0.4¢ 0.4¢ 0.4¢ $1.216K 304K

Buyers (Bids)

No. Vol. Price($)
1 1446000 0.4¢
 

Sellers (Offers)

Price($) Vol. No.
0.5¢ 1138228 3
View Market Depth
Last trade - 14.16pm 25/06/2024 (20 minute delay) ?
CRB (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.