EXR 3.03% 16.0¢ elixir energy limited

the two well drilling program will take less than 30 days, with...

  1. 1,487 Posts.
    lightbulb Created with Sketch. 73
    the two well drilling program will take less than 30 days, with pilot production testing
    operations to begin within weeks of the wells being completed.
 
watchlist Created with Sketch. Add EXR (ASX) to my watchlist
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.