55m coal encountered.
Elixir’s Managing Director, Mr Neil Young, said: “We are pleased to report that our pilot production
program is on track with the successful drilling and completion of Nomgon-9. I congratulate our drilling
contractor Major Drilling and our own on-site team, who have worked tirelessly to deliver a quick, safe
and fit for purpose pilot well. We look forward to moving into the pilot production phase, and although
the timing and quantums of water and gas flows from the wells is uncertain in such a new area, we
could see meaningful gas breakthroughs by as early as Christmas.”
Rig on the way to second location. Its all on track.
- Forums
- ASX - By Stock
- EXR
- Ann: CBM Pilot Project Update
Ann: CBM Pilot Project Update, page-2
-
- There are more pages in this discussion • 76 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add EXR (ASX) to my watchlist
(20min delay)
|
|||||
Last
12.0¢ |
Change
0.000(0.00%) |
Mkt cap ! $136.0M |
Open | High | Low | Value | Volume |
12.0¢ | 12.5¢ | 12.0¢ | $63.86K | 529.2K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
5 | 136581 | 12.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
12.5¢ | 210097 | 8 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
13 | 408803 | 0.115 |
34 | 1431296 | 0.110 |
10 | 1700765 | 0.105 |
37 | 1827096 | 0.100 |
2 | 76700 | 0.099 |
Price($) | Vol. | No. |
---|---|---|
0.125 | 210097 | 8 |
0.130 | 1019177 | 3 |
0.135 | 243382 | 7 |
0.140 | 268804 | 7 |
0.145 | 922966 | 10 |
Last trade - 11.11am 10/05/2024 (20 minute delay) ? |
|
|||||
Last
12.0¢ |
  |
Change
0.000 ( 4.35 %) |
|||
Open | High | Low | Volume | ||
11.5¢ | 12.5¢ | 11.5¢ | 514089 | ||
Last updated 11.31am 10/05/2024 ? |
Featured News
EXR (ASX) Chart |