This would be an awesome move. Clarke would have these engines ready as a drop in for one of these plants. Theres half a dozen of them running in Central QLD now making up to 40MW. Running off coal mine gas drainage, which is not as high quality as we will have generally.
I'd reckon it would be a 6 month construction period. Civils and the HV interconnect would be longest part. Engines are packaged to drop into place with a small local control room, workshop, office/staff room and a switchyard.
- Forums
- ASX - By Stock
- EXR
- Ann: CBM Pilot Project Update
Ann: CBM Pilot Project Update, page-41
-
- There are more pages in this discussion • 32 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add EXR (ASX) to my watchlist
(20min delay)
|
|||||
Last
16.5¢ |
Change
0.000(0.00%) |
Mkt cap ! $197.4M |
Open | High | Low | Value | Volume |
17.0¢ | 17.0¢ | 16.0¢ | $254.5K | 1.534M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 316607 | 16.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
17.0¢ | 106270 | 7 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 316607 | 0.165 |
8 | 231589 | 0.160 |
4 | 241166 | 0.155 |
13 | 554770 | 0.150 |
7 | 539692 | 0.145 |
Price($) | Vol. | No. |
---|---|---|
0.170 | 100388 | 6 |
0.175 | 353986 | 7 |
0.180 | 690855 | 13 |
0.185 | 68701 | 3 |
0.190 | 199892 | 9 |
Last trade - 16.10pm 04/10/2024 (20 minute delay) ? |
Featured News
EXR (ASX) Chart |