EXR 4.17% 11.5¢ elixir energy limited

My thought is that the 10MW module plant would be installed...

  1. 144 Posts.
    lightbulb Created with Sketch. 18
    My thought is that the 10MW module plant would be installed within 12 months with another 5 or 10 MW module attached down the track.
    The national electricity grid line finishes in the township of Nomgon which is only about 25 kilometres from the well. Not too far to run a cable and would be a benefit for the local Government.

    Looking at the bigger picture down the track after EXR has been taken over I can see when the Russian pipeline has been built to supply gas to China it would offload gas to townships in the northern areas of Mongolia and wells in the Soutg Gobi area would then replenish the pipeline before it arrives in China.

    DYOR


 
watchlist Created with Sketch. Add EXR (ASX) to my watchlist
(20min delay)
Last
11.5¢
Change
-0.005(4.17%)
Mkt cap ! $130.4M
Open High Low Value Volume
12.0¢ 12.5¢ 11.5¢ $134.1K 1.126M

Buyers (Bids)

No. Vol. Price($)
12 411871 11.5¢
 

Sellers (Offers)

Price($) Vol. No.
12.0¢ 287415 4
View Market Depth
Last trade - 16.10pm 10/05/2024 (20 minute delay) ?
Last
11.8¢
  Change
-0.005 ( 2.17 %)
Open High Low Volume
11.5¢ 12.5¢ 11.5¢ 988409
Last updated 15.40pm 10/05/2024 ?
EXR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.