EXR 20.0% 12.0¢ elixir energy limited

Ann: CBM Pilot Project Update, page-53

  1. 2,701 Posts.
    lightbulb Created with Sketch. 615
    Yeah as long as the plant is engineered with the right switchgear/switchyard flr expansion. I think the Clarke Energy plants Ive seen in Central QLD are Jenbacher engines. 3MW each. Tried and tested and do the job on dirtier mine drainage gas with very little scrubbing. Low pressures as well, around 30kpa inlet pressures. The engines fuel gas is like 7kpa? It wouldn't be hard to feed them from Nomgon field.

    All we need is the gas and its on.
 
watchlist Created with Sketch. Add EXR (ASX) to my watchlist
(20min delay)
Last
12.0¢
Change
0.020(20.0%)
Mkt cap ! $136.0M
Open High Low Value Volume
10.5¢ 12.0¢ 10.5¢ $191.0K 1.709M

Buyers (Bids)

No. Vol. Price($)
3 175000 11.5¢
 

Sellers (Offers)

Price($) Vol. No.
12.0¢ 868451 9
View Market Depth
Last trade - 16.10pm 05/07/2024 (20 minute delay) ?
EXR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.