Yeah as long as the plant is engineered with the right switchgear/switchyard flr expansion. I think the Clarke Energy plants Ive seen in Central QLD are Jenbacher engines. 3MW each. Tried and tested and do the job on dirtier mine drainage gas with very little scrubbing. Low pressures as well, around 30kpa inlet pressures. The engines fuel gas is like 7kpa? It wouldn't be hard to feed them from Nomgon field.
All we need is the gas and its on.
- Forums
- ASX - By Stock
- Ann: CBM Pilot Project Update
Yeah as long as the plant is engineered with the right...
-
- There are more pages in this discussion • 20 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add EXR (ASX) to my watchlist
|
|||||
Last
10.0¢ |
Change
-0.008(6.98%) |
Mkt cap ! $113.3M |
Open | High | Low | Value | Volume |
10.5¢ | 10.5¢ | 10.0¢ | $301.0K | 2.944M |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
15 | 1268373 | 10.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
10.5¢ | 1189691 | 4 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
15 | 1268373 | 0.100 |
1 | 5550 | 0.099 |
2 | 54020 | 0.098 |
3 | 129668 | 0.097 |
4 | 930000 | 0.096 |
Price($) | Vol. | No. |
---|---|---|
0.105 | 1189691 | 4 |
0.110 | 25000 | 1 |
0.115 | 168722 | 3 |
0.120 | 226939 | 5 |
0.125 | 341333 | 4 |
Last trade - 16.10pm 30/07/2024 (20 minute delay) ? |
Featured News
EXR (ASX) Chart |
The Watchlist
MTL
MANTLE MINERALS LIMITED
Nick Poll, Executive Director
Nick Poll
Executive Director
SPONSORED BY The Market Online