There is surely not alot left to do now? So with the cold commissioning they were able to run the catalyst feed system and the gas inlet, test all of the safety functions you would imagine, and with this hot reactor it's a case of now having hydrogen on site with alot of graphite..
Apart from a bit of control system addition, I can't see how there are any major things to do. The furnace needing a bit of run time as well, and testing some loops for optimum efficiency, and slowly introducing the right staged heating, we should be off and away very soon.
- Forums
- ASX - By Stock
- Ann: CDP Commissioning Underway After Successful Reactor Install
HZR
hazer group limited
Add to My Watchlist
1.67%
!
29.5¢

There is surely not alot left to do now? So with the cold...
Featured News
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
|
|||||
Last
29.5¢ |
Change
-0.005(1.67%) |
Mkt cap ! $74.73M |
Open | High | Low | Value | Volume |
30.0¢ | 30.0¢ | 29.5¢ | $110.2K | 368.4K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
20 | 507643 | 29.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
30.0¢ | 33232 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
18 | 487643 | 0.295 |
23 | 372946 | 0.290 |
8 | 218172 | 0.285 |
12 | 110454 | 0.280 |
2 | 35000 | 0.275 |
Price($) | Vol. | No. |
---|---|---|
0.300 | 33232 | 3 |
0.305 | 512584 | 10 |
0.310 | 122178 | 8 |
0.315 | 50000 | 1 |
0.325 | 45000 | 1 |
Last trade - 16.10pm 27/06/2025 (20 minute delay) ? |
Featured News
HZR (ASX) Chart |
The Watchlist
PAR
PARADIGM BIOPHARMACEUTICALS LIMITED..
Paul Rennie, MD & Founder
Paul Rennie
MD & Founder
SPONSORED BY The Market Online