Edit to above. The two pipes will be welded. Shown on the truck!
Edit two. Picture shows the reactor is already on the truck! Loaded and Secured! Almost bet that pic was taken Friday, Saturday or less likely on Sunday. Anyone suspecting a picture of the installed hot reactor at Woodmans point this week might be a safe assumption.
Edit 3. I have a bit of interest in SMR- Small Modular Reactors in the Nuclear Power area. Looking at the reactor for the CDP makes it clear that scaling the reactors up and replication of it would be very similar for Mass-production.
for
- Suncor and FortisBC Energy to develop a 2500 tonne per annum hydrogen project
- Hazer and ENGIE Project Development Plan (“PDP”) at Montoir-de-Bretagne in France he planned production facility is targeting an initial production capacity of at least 2,500 tonne per annum (tpa) of hydrogen
- Nagoya-based Chubu Electric Power Company Inc. and Chiyoda Corporation to work together on a Project Development Plan (PDP) up to 100,000 tpa
The scale up via adding extra reactor Modules and in increasing the reactor size is both achievable.
- Forums
- ASX - By Stock
- Ann: CDP Drives Towards Start-Up As Reactor Fabrication Completed
HZR
hazer group limited
Add to My Watchlist
1.67%
!
29.5¢

Edit to above. The two pipes will be welded. Shown on the...
Featured News
Add to My Watchlist
What is My Watchlist?
A personalised tool to help users track selected stocks. Delivering real-time notifications on price updates, announcements, and performance stats on each to help make informed investment decisions.
|
|||||
Last
29.5¢ |
Change
-0.005(1.67%) |
Mkt cap ! $74.73M |
Open | High | Low | Value | Volume |
30.0¢ | 30.0¢ | 29.5¢ | $110.2K | 368.4K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
20 | 507643 | 29.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
30.0¢ | 33232 | 3 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
18 | 487643 | 0.295 |
23 | 372946 | 0.290 |
8 | 218172 | 0.285 |
12 | 110454 | 0.280 |
2 | 35000 | 0.275 |
Price($) | Vol. | No. |
---|---|---|
0.300 | 33232 | 3 |
0.305 | 512584 | 10 |
0.310 | 122178 | 8 |
0.315 | 50000 | 1 |
0.325 | 45000 | 1 |
Last trade - 16.10pm 27/06/2025 (20 minute delay) ? |
Featured News
HZR (ASX) Chart |
The Watchlist
PAR
PARADIGM BIOPHARMACEUTICALS LIMITED..
Paul Rennie, MD & Founder
Paul Rennie
MD & Founder
SPONSORED BY The Market Online