HZR 1.45% 34.0¢ hazer group limited

Installation of new equipment invariably requires extra...

  1. 4,773 Posts.
    lightbulb Created with Sketch. 273
    Installation of new equipment invariably requires extra maintenance and I presume why they have allocated January for startup, hydrogen Q1 and continuous Q1/Q2
    "I was thinking more of engineering of electronic components or repairs." But the same also applies to the supply of the methane.
    Last edited by sewell64: 02/01/24
 
watchlist Created with Sketch. Add HZR (ASX) to my watchlist
(20min delay)
Last
34.0¢
Change
-0.005(1.45%)
Mkt cap ! $78.23M
Open High Low Value Volume
34.0¢ 34.5¢ 33.5¢ $48.58K 142.6K

Buyers (Bids)

No. Vol. Price($)
3 20392 34.0¢
 

Sellers (Offers)

Price($) Vol. No.
34.5¢ 45548 4
View Market Depth
Last trade - 16.10pm 29/07/2024 (20 minute delay) ?
HZR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.