If there is any engineering occuring of electronic parts I would be dumbfounded.
Nothing on that plant control-wise wouldn't be stocked in Perth. The design end was done well and trully before this stage. Any changes would be control logic or process. Of which would be rates and temperatures, feed gas parameters, heat staging, etc etc.
If they need components for repair, when the equipment will all be SIL rated at minimum for operational safety, it would be an absolute failure for a component.
- Forums
- ASX - By Stock
- Ann: CDP Reactor Successfully Commissioned
If there is any engineering occuring of electronic parts I would...
-
- There are more pages in this discussion • 165 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add HZR (ASX) to my watchlist
(20min delay)
|
|||||
Last
31.0¢ |
Change
-0.010(3.13%) |
Mkt cap ! $71.33M |
Open | High | Low | Value | Volume |
32.0¢ | 32.0¢ | 30.5¢ | $92.70K | 293.5K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
5 | 23605 | 30.5¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
31.0¢ | 46199 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
1 | 2 | 0.310 |
4 | 22605 | 0.305 |
10 | 52166 | 0.300 |
7 | 61880 | 0.295 |
6 | 15735 | 0.290 |
Price($) | Vol. | No. |
---|---|---|
0.315 | 18020 | 1 |
0.320 | 43620 | 4 |
0.325 | 13028 | 3 |
0.330 | 14876 | 5 |
0.335 | 10300 | 2 |
Last trade - 16.10pm 04/09/2024 (20 minute delay) ? |
Featured News
HZR (ASX) Chart |