"I’m wondering if this won’t turn out to be a smaller delay than it seems."
From the announcement:
"the heat-exchanger vessel suffered a critical failure during the heat-treatment process".
"the failure of the heat-exchanger is expected to defer the production of hydrogen and graphite from the current target of the end of2022 to sometime in 2023."
I don't see this coming back till the end of 2022 at the very least. If it does then there's something very misleading with this announcement for holders that are going to suffer the envisaged sell-down. I've lost all confidence with this company.
- Forums
- ASX - By Stock
- Ann: CDP SCHEDULE DELAY
"I’m wondering if this won’t turn out to be a smaller delay than...
-
-
- There are more pages in this discussion • 81 more messages in this thread...
You’re viewing a single post only. To view the entire thread just sign in or Join Now (FREE)
Featured News
Add HZR (ASX) to my watchlist
(20min delay)
|
|||||
Last
35.0¢ |
Change
0.005(1.45%) |
Mkt cap ! $80.53M |
Open | High | Low | Value | Volume |
34.5¢ | 35.5¢ | 33.5¢ | $66.17K | 192.2K |
Buyers (Bids)
No. | Vol. | Price($) |
---|---|---|
3 | 23100 | 33.0¢ |
Sellers (Offers)
Price($) | Vol. | No. |
---|---|---|
35.0¢ | 599 | 1 |
View Market Depth
No. | Vol. | Price($) |
---|---|---|
3 | 23100 | 0.330 |
3 | 8433 | 0.320 |
2 | 20000 | 0.315 |
6 | 62017 | 0.310 |
4 | 109854 | 0.305 |
Price($) | Vol. | No. |
---|---|---|
0.350 | 599 | 1 |
0.360 | 6763 | 2 |
0.375 | 10645 | 2 |
0.380 | 40118 | 4 |
0.390 | 5000 | 1 |
Last trade - 16.10pm 08/11/2024 (20 minute delay) ? |
Featured News
HZR (ASX) Chart |
The Watchlist
EQN
EQUINOX RESOURCES LIMITED.
Zac Komur, MD & CEO
Zac Komur
MD & CEO
SPONSORED BY The Market Online