HZR 0.00% 46.5¢ hazer group limited

Ann: CDP SCHEDULE DELAY, page-5

  1. 51 Posts.
    lightbulb Created with Sketch. 4
    I wonder how big and what material is used for the heat exchanger? They could possibly be 3D printed instead and save a heap of time!
 
watchlist Created with Sketch. Add HZR (ASX) to my watchlist
(20min delay)
Last
46.5¢
Change
0.000(0.00%)
Mkt cap ! $107.0M
Open High Low Value Volume
46.5¢ 48.0¢ 46.0¢ $53.33K 115.6K

Buyers (Bids)

No. Vol. Price($)
1 1702 46.5¢
 

Sellers (Offers)

Price($) Vol. No.
48.0¢ 20478 2
View Market Depth
Last trade - 16.10pm 05/06/2024 (20 minute delay) ?
Last
46.5¢
  Change
0.000 ( 0.00 %)
Open High Low Volume
47.0¢ 47.5¢ 46.0¢ 42653
Last updated 15.41pm 05/06/2024 ?
HZR (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.