OEL 8.33% 1.3¢ otto energy limited

Ann: Ceasing to be a Substantial Shareholder - Santo, page-19

  1. 9,209 Posts.
    lightbulb Created with Sketch. 735
    I think we should certainly get an update on monday - based on the ann released on the 3rd April

    The F3 well is expected to be opened to flowback equipment on the Ensco 68 rig for an initial clean-up on Tuesday, 3 April 2018 USCDT. No production rates will be established from the F3 well at that time, due to limited oil tankage on the rig. Once the flowback is accomplished, the Ensco 68 will begin the process of de-rigging and jacking down before it is released later this week. The Company will then make the final flowline tie-ins to the F3 well and install instrumentation equipment so that production can commence by the end of the week.
    1. SM71 Oil Pipeline Maintenance
      Byron has been advised by Crimson Gulf, LLC, the operator of the oil pipeline that carries SM71 oil to market that due to maintenance on other sections of the oil pipeline, a pipeline shut in will occur next week. Currently, the shut in is scheduled to begin on 10 April 2018 and last 2 or 3 days. Byron’s SM71 wells will be off line during that time and will resume as soon as possible when the shut in is over.
 
watchlist Created with Sketch. Add OEL (ASX) to my watchlist
(20min delay)
Last
1.3¢
Change
0.001(8.33%)
Mkt cap ! $62.33M
Open High Low Value Volume
1.2¢ 1.3¢ 1.2¢ $12.34K 1.028M

Buyers (Bids)

No. Vol. Price($)
9 17892904 1.2¢
 

Sellers (Offers)

Price($) Vol. No.
1.3¢ 12332282 21
View Market Depth
Last trade - 16.10pm 28/06/2024 (20 minute delay) ?
OEL (ASX) Chart
arrow-down-2 Created with Sketch. arrow-down-2 Created with Sketch.